Wind and Snow Loads on Solar Mounting Structures: A Practical Guide

A solar system stays outdoors for more than 20 years. Over that time the mounting structure that holds the modules on a roof or on the ground has to survive storms, heavy snowfall and earthquakes. A module torn off by the wind can drag others at the end of the row with it and damage the roof or injure people nearby. This article covers the loads that act on a mounting structure, the factors that make them larger, the role of the standards, the differences between rooftop and ground-mount work, and a pre-project checklist.

Which loads matter

These loads are not checked one at a time but in the combinations defined by the standards. Which combination governs depends on the site and the structure.

Factors that increase the loads

FactorWhy it matters
LocationThe regional wind speed and snow load values are the starting data for the project. Coastal and high-altitude sites need particular care.
Terrain and surroundingsOpen flat land, a seafront or a hilltop sees more wind than a densely built-up area.
Building heightWind speed increases with height above ground, so roofs of tall buildings see larger effects.
Roof typeTiled roofs, trapezoidal sheet, sandwich panels and flat concrete roofs differ in fixing method and in how load reaches the structure.
Module tilt and heightModules raised above the roof or tilted catch more wind; tilted systems on flat roofs need particular attention.
Edge and corner zonesWind suction near roof edges and corners is markedly higher than in the middle of the roof. Extra fixings or a larger setback may be needed there.

The role of the standards

In Turkey, load calculations follow the TS EN series, the Turkish adoption of the European standards. Actions (loads) are covered by the TS EN 1991 (Eurocode 1) family, with separate parts dealing with permanent loads, snow and wind. Steel members are designed to TS EN 1993 (Eurocode 3) and aluminium members to TS EN 1999 (Eurocode 9). Seismic action is assessed under the national earthquake regulation for buildings currently in force.

These standards define methods that take account of regional base values, terrain category, building height and surface shape. The choice of coefficients and regional values must be made by an authorised engineer, using the current edition of the standard and its national annex. We deliberately give no coefficients or zone values here; a wrong number is more dangerous than no number.

Rooftop considerations

Ground-mount considerations

Foundations and anchoring

The weakest link in a mounting structure is often not the profile but the connections and the foundation. When wind suction pulls a module upwards, the force passes from the clamp to the rail, from the rail to the hook or leg, and from there into the roof or foundation. Every link in that chain must carry the same load. On ground-mount projects, foundation size should be checked not only for vertical load but also for uplift and overturning.

Pre-project checklist

  1. Have the site location, altitude and surroundings (open land, coast, built-up area) been recorded?
  2. Have building height, roof type and the condition of the roof structure been documented during the site survey?
  3. Have module tilt, height above the roof and edge distances been decided?
  4. Have the module manufacturer's clamping zones and test loads been checked?
  5. Has fixing density in edge and corner zones been assessed separately?
  6. Have locations where snow may drift (parapets, level changes) been marked?
  7. For ground-mount projects, are the ground data and foundation type clear?
  8. Are materials and coatings (galvanised steel, aluminium, stainless fixings) suitable for the environment?
  9. Has the load calculation and structural project been prepared and approved by an authorised engineer?

Mounting calculations with PVAGE

The PVAGE structural calculation module produces rail, hook, screw and clamp quantities based on roof type, and calculates leg and profile dimensions and foundation sizing for ground-mount projects. It provides a pre-suitability check for buckling, bending, deflection and shear, with results in a PDF. This check does not replace an approved structural project; it is meant to steer the design early and produce quantities quickly.

See the structural calculation page for details, and the mounting system design page for ground-mount layouts.

Explore the feature: Solar Mounting BOM and Pre-Check

Blog

More Articles

Project Drawings

Solar Project Drawings: Single-Line Diagram, Earthing Plan and General Layout Plan

What a solar single-line diagram, earthing plan and general layout show, and why generating them from the design as PDF and DXF saves time.

Read the article
Energy Storage

What Is a Containerised Battery (BESS)? Capacity, Layout and Proposal Guide for Solar-Plus-Storage

What a containerised battery energy storage system (BESS) contains, MW vs MWh, how to size capacity, site layout considerations and what to state in the proposal.

Read the article
CRM

CRM for Solar Companies: How to Track Customers from Lead to Handover

Why solar CRM differs from a generic CRM: what a solar customer record should hold, sales stages, follow-up rhythm, metrics to watch and common mistakes.

Read the article
All articles
Get Started

Ready to Digitalize Your Solar Business?

Manage your projects faster, more accurately, and more professionally with PVAGE.

Request Company Registration

Fill out the form and our team will contact you

+90

Notice: Once your request is approved, your login credentials will be sent to the phone number and email address you provided.

Request Received!

Our team will contact you shortly.

Schedule a Meeting

Fill out the form and let's set up your meeting

+90

Request Received!

Your meeting request has been received. Our team will contact you shortly.