Mounting material quantities and a preliminary structure check.
PVAGE calculates mounting material quantities based on roof type and panel layout, computes front, middle and rear leg and profile dimensions step by step for ground-mounted projects, performs foundation sizing, and provides a pre-suitability check for the mounting structure.
The pre-suitability check reports buckling, bending, deflection and shear, together with site factors such as dirt and dust accumulation and cabling, as sufficient or insufficient. The pre-suitability check is a preliminary engineering assessment and does not replace an approved structural engineering project.
Calculate location-specific monthly production with European Commission PVGIS satellite data and compare it with consumption.
Learn moreCalculate the payback period from cost, savings, financing scenarios and electricity price escalation assumptions.
Learn moreSize panels, batteries and inverters from the appliance list, simultaneity and start-up current.
Learn morePanel arrangement and fuse recommendations for solar irrigation based on pump power and well depth.
Learn moreTry PVAGE with your own projects in a 7-day free demo; no credit card required.